Hazleton Logistics 141 Warehouse Building One
Sector: Automotive • Location: Hazleton, Pennsylvania, United States of America
Source: Dodge USA
Proposed Area 1,058,483 SF Area Dimensions 620 x 1,700 SF Dock Doors 104 docks Future Docks 72 docks Car Parking 831 spaces Trailer Parking 360 spaces Drive-In doors 1 door, CONSTRUCTION 100% Tilt Up Concrete 1,054,000 square foot warehouse on the south side of Arthur Gardner Parkway, between the filtration plant and where Arthur Gardner intersects with Route 93. The project spans both the City of
- Status
- Under Construction
- Sector
- Automotive, Warehouse, Cement, Commercial, Road, Car parking, Manufacturing (Industrial)
- Location
- Hazleton, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hazleton Logistics 141 Warehouse Building One
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Proposed Area 1,058,483 SF Area Dimensions 620 x 1,700 SF Dock Doors 104 docks Future Docks 72 docks Car Parking 831 spaces Trailer Parking 360 spaces Drive-In doors 1 door, CONSTRUCTION 100% Tilt Up Concrete 1,054,000 square foot warehouse on the south side of Arthur Gardner Parkway, between the filtration plant and where Arthur Gardner intersects with Route 93. The project spans both the City of Hazleton and Hazle Township. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Hazleton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Warehouse, Cement, Commercial, Road, Car parking, Manufacturing (Industrial) |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
