logo

HCE Collier Solar Project Power Purchase

Sector: Power Generation (CCGT) • Location: Wise County, Virginia, United States

Source: NewsBreak: Local News & Alerts

Project
Planned

Appalachian Power plans to purchase electricity for 28 years from the 7.5-megawatt HCE Collier Solar project in Wise County, Virginia, once the facility begins operating in May 2027.

Status
Prospective
Sector
Power Generation (CCGT), Solar
Location
Wise County, Virginia, United States of America
Updated
22 Jul 2026
Source
NewsBreak: Local News & Alerts

ConstructChat

Ask ConstructChat about HCE Collier Solar Project Power Purchase

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “HCE Collier Solar Project Power Purchase” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Wise County, Virginia, United States. Taiyo aggregates data on it from NewsBreak: Local News & Alerts.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Appalachian Power plans to purchase electricity for 28 years from the 7.5-megawatt HCE Collier Solar project in Wise County, Virginia, once the facility begins operating in May 2027.

Original sector

Energy

Location

Country

United States of America (USA)

State

Virginia

City

Wise County

Source

Source

NewsBreak: Local News & Alerts

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2025-05-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project