logo

He Dreiht Wind Farm Service Operations Vessel

Sector: Seaport • Location: Germany

Source: Offshore Magazine

Project
Under Construction

North Star and Cochin Shipyard have cut the first steel for a new hybrid-electric service operations vessel (SOV) designed to service the He Dreiht wind farm offshore Germany. The vessel is scheduled to begin operations in 2026 and will accommodate up to 34 technicians.

Status
Under Construction
Sector
Seaport, Raw Materials, Steel, Metal, Wind
Location
Germany
Updated
22 Jul 2026
Source
Offshore Magazine

ConstructChat

Ask ConstructChat about He Dreiht Wind Farm Service Operations Vessel

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “He Dreiht Wind Farm Service Operations Vessel” is an infrastructure initiative in the Seaport sector, located in Germany. Taiyo aggregates data on it from Offshore Magazine.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

North Star and Cochin Shipyard have cut the first steel for a new hybrid-electric service operations vessel (SOV) designed to service the He Dreiht wind farm offshore Germany. The vessel is scheduled to begin operations in 2026 and will accommodate up to 34 technicians.

Original sector

Renewable Energy

Location

Country

Germany

Source

Source

Offshore Magazine

URL

More Details

Record type

Project

Sector

Seaport, Raw Materials, Steel, Metal, Wind

Article published date

2025-03-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project