Head Start Building Addition REBID
Sector: Commercial • Location: Green Bay, Wisconsin, United States of America
Source: Dodge
In general, work to consist of a 1-story addition of approximately 3,111 s.f. consisting of concrete, masonry, EPDM roof, metal deck, steel roof joints, hollow metal and wood doors and frames, wood work, hardware, glass, drywall, acoustical ceilings, resilient floors, painting, plumbing, heating and air conditioning, electrical and sitework.
- Status
- Closed
- Sector
- Commercial, Power Generation (CCGT), Metal, Cement, Manufacturing (Industrial), Education, Government, Steel
- Location
- Green Bay, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Head Start Building Addition REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, work to consist of a 1-story addition of approximately 3,111 s.f. consisting of concrete, masonry, EPDM roof, metal deck, steel roof joints, hollow metal and wood doors and frames, wood work, hardware, glass, drywall, acoustical ceilings, resilient floors, painting, plumbing, heating and air conditioning, electrical and sitework. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Green Bay |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Metal, Cement, Manufacturing (Industrial), Education, Government, Steel |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
