logo

Headland Solar Project

Sector: Solar • Location: Conway Township, Michigan, United States

Source: Livingston Daily

Project
Proposed

The Headland Solar Project is a proposed 220-megawatt solar farm located on roughly 1,500 acres in Cohoctah Township and Conway Township in Livingston County, Michigan. The project is developed by Ranger Power, a utility-scale renewable energy development company based in Chicago. The project aims to produce clean, renewable energy and provide economic benefits including over $18 million in new ta

Status
Prospective
Sector
Solar, Raw Materials, Power Generation (CCGT), Power Transmission
Location
Conway Township, Michigan, United States of America
Updated
22 Jul 2026
Source
Livingston Daily

ConstructChat

Ask ConstructChat about Headland Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Headland Solar Project” is an infrastructure initiative in the Solar sector, located in Conway Township, Michigan, United States. Taiyo aggregates data on it from Livingston Daily.

Participants

Not available for this record.

Status

Original status

Proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Headland Solar Project is a proposed 220-megawatt solar farm located on roughly 1,500 acres in Cohoctah Township and Conway Township in Livingston County, Michigan. The project is developed by Ranger Power, a utility-scale renewable energy development company based in Chicago. The project aims to produce clean, renewable energy and provide economic benefits including over $18 million in new tax revenue. Conway and Cohoctah Townships have agreed to split the cost of reviewing the project, including legal counsel, consultants, studies, and reports, with costs paid from an escrow account funded by Ranger Power.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Conway Township

Source

Source

Livingston Daily

URL

More Details

Record type

Project

Sector

Solar, Raw Materials, Power Generation (CCGT), Power Transmission

Article published date

2025-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project