Headlands Beach State Park Automatic Gate Repair
Closed · Ohio · Last reported Nov 2024
Source: Dodge USA
The repaired/replaced automated gate and control equipment must match the previous gate, and that of the current exit gate. In light of materials and equipment becoming unavailable, or obsolete, the next version is acceptable. As such, the following must be considered. The material(s), look, and functionality of the gate panels must match the former gate, and the current exit gate. o This includes
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Car parking, Automotive
- Location
- Mentor, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Headlands Beach State Park Automatic Gate Repair
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The repaired/replaced automated gate and control equipment must match the previous gate, and that of the current exit gate. In light of materials and equipment becoming unavailable, or obsolete, the next version is acceptable. As such, the following must be considered. The material(s), look, and functionality of the gate panels must match the former gate, and the current exit gate. o This includes the color and sheen of the finish The hinges should be as similar to the former hinges as possib... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Mentor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Car parking, Automotive |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
