Headquarters and Field Space – Mogos Scout School / Cossement-Cardoso
Sector: Cement
Source: ArchDaily
The wooden volume of the locker rooms was designed with a simple structure that can be easily assembled and disassembled to minimize its impact on the terrain and raised on foundations to elevate it from the ground.It was proposed to extend the façade of the lower volume, aligning it with the eaves of the existing higher volume. This addition was constructed with a lightweight wooden structure, fe
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The wooden volume of the locker rooms was designed with a simple structure that can be easily assembled and disassembled to minimize its impact on the terrain and raised on foundations to elevate it from the ground.It was proposed to extend the façade of the lower volume, aligning it with the eaves of the existing higher volume. This addition was constructed with a lightweight wooden structure, featuring a glass panel on the northern elevation and brick masonry on the other sides. This approach simultaneously ensures a unified volumetric design and a clear distinction between the existing and the newly proposed elements.The materials used for the locker room structure are similar to those used for the rehabilitation of the existing building, featuring a wooden structure with protective varnish and a black corrugated sheet covering. This approach aims to create a unified appearance within the proposed intervention, establishing a clear and cohesive design language for the new elements to be integrated into the site.Text description provided by the architects.The project consists of two distinct interventions: the rehabilitation of a ruin and the installation of a locker room structure.The intervention in the existing building was designed with the aim of making the use of the interior space as versatile as possible while ensuring its sanitary conditions. This was achieved through the adoption of simple and easily implementable design strategies that align with the available budget.The long, linear volume is situated parallel to the Ribeira do Morgado, near the existing tanks that are proposed to be reactivated. This location enables interaction with the tanks and the direct drainage of rainwater from the roof of this structure into the stream. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
