Headquarters Complex Repairs and Replacements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Project scope includes all labor, equipment, tools, materials, and incidentals required for repairs and replacements to multiple buildings at the Wildlife Management Area headquarters complex. This includes but is not limited to: Base Proposal-- envelope repairs and replacements associated with the exterior walls, windows and doors to the site s Residence Building and Shop/Office building. Proposa
- Status
- Closed
- Sector
- Metal, Commercial, Residential
- Location
- Morton, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Headquarters Complex Repairs and Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project scope includes all labor, equipment, tools, materials, and incidentals required for repairs and replacements to multiple buildings at the Wildlife Management Area headquarters complex. This includes but is not limited to: Base Proposal-- envelope repairs and replacements associated with the exterior walls, windows and doors to the site s Residence Building and Shop/Office building. Proposal Option- envelope repair and replacements associated with the exterior metal roof panels at the ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Morton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Residential |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
