logo

Headwater Energy Solar Project

Sector: Solar • Location: North Carolina, United States

Source: Morningstar

Project
Planned

The Headwater Energy Solar Project, known as Gum Swamp Solar, is a 112-megawatt DC solar project located in North Carolina. It aims to generate 191,000 MWh of clean energy annually, enough to power approximately 17,000 households in the state.

Status
Prospective
Sector
Solar, Power Generation (CCGT)
Location
North Carolina, United States of America
Updated
22 Jul 2026
Source
Morningstar

ConstructChat

Ask ConstructChat about Headwater Energy Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Headwater Energy Solar Project” is an infrastructure initiative in the Solar sector, located in North Carolina, United States. Taiyo aggregates data on it from Morningstar.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Headwater Energy Solar Project, known as Gum Swamp Solar, is a 112-megawatt DC solar project located in North Carolina. It aims to generate 191,000 MWh of clean energy annually, enough to power approximately 17,000 households in the state.

Original sector

Energy

Location

Country

United States of America (USA)

State

North Carolina

Source

Source

Morningstar

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2025-01-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project