Headwaters Elementary (DSISD #6) School Fiber Extension
Sector: Power Transmission • Location: Dripping Springs, Texas, United States of America
Source: Dodge USA
The District is currently constructing a new facility, an Elementary School within the Headwaters Development in Drippings Springs, Texas. This CSP will extend the existing OSP Fiber Backbone that runs along the existing Pedernales Electric Cooperative poles on US HWY 290, into the new District Facilities within Headwaters. The scope includes all labor, materials, Utility Coordination, licensing,
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Road, Government, Commercial, Education
- Location
- Dripping Springs, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Headwaters Elementary (DSISD #6) School Fiber Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The District is currently constructing a new facility, an Elementary School within the Headwaters Development in Drippings Springs, Texas. This CSP will extend the existing OSP Fiber Backbone that runs along the existing Pedernales Electric Cooperative poles on US HWY 290, into the new District Facilities within Headwaters. The scope includes all labor, materials, Utility Coordination, licensing, permitting, and all required testing for a turn-key installation. There is an existing OSP Connec... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Dripping Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Road, Government, Commercial, Education |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
