logo

Health and Social Innovation Centre - UNB Saint John

Sector: Water Supply and Storage • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
In Progress

University of New Brunswick - Saint John campus is embarking on the construction of the proposed $38M Health and Social Innovation Centre. The centre will enable UNB SJ to fully implement the new Bachelor of Health interdisciplinary undergraduate program and support the university’s Integrated Health Initiative. The new HSIC will be built on the site of the vacant Ward Chipman Library (WCL) which

Project Information FAQ

Project Information

4 Q
The project “Health and Social Innovation Centre - UNB Saint John” is an infrastructure initiative in the Water Supply and Storage sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

University of New Brunswick - Saint John campus is embarking on the construction of the proposed $38M Health and Social Innovation Centre. The centre will enable UNB SJ to fully implement the new Bachelor of Health interdisciplinary undergraduate program and support the university’s Integrated Health Initiative. The new HSIC will be built on the site of the vacant Ward Chipman Library (WCL) which was built in 1969 and is not cost-effective for redevelopment (independent assessment). The existing WCL has a deferred maintenance value of $6.8 million, and nearby affiliated infrastructure another $2.5 million. These two items represent approximately 34% of total deferred maintenance for the campus. The new building has been designed and will be built to green building standards, aiming for a high LEED standard. It has been designed and built with a focus on promoting human and environmental health, considering factors such as location and transportation, sustainable site development, water savings, energy efficiency, materials, and indoor environmental quality. In addition, the University has hired specialized services to ensure the high efficiency of the building and, ultimately, to reduce its energy footprint. These services include: Enhanced Building Commissioning, Building Envelope Commissioning and Building Life Cycle Impact Reduction. The building will be equipped with geothermal technology and efficient building systems, allowing for significant infrastructure renewal, substantial carbon offset and energy savings, thus adhering to the mandates set forth in New Brunswick’s Climate Change Action. The works on the tunnel and underground infrastructure will also serve as a geothermal network integrator for an expansion of geothermal to other related buildings on the Saint John Campus.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data