logo
ProjectCompleted

Health PEI Generator Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

This project involves the installation/replacement of three generators. The generators will be fixed assets. This project involves the addition of a second generator at Prince County Hospital (750KW) and the replacement of outdated generators at Beach Grove Home (350KW) and Hillsborough Hospital (50KW). New generators at these facilities will be sized to provide a minimum of 48 hours of backup pow

Status
Closed
Sector
Hospital, Power Generation (CCGT), Residential, Government
Location
Prince Edward Island, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Health PEI Generator Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Health PEI Generator Replacement” is an infrastructure initiative in the Hospital sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project involves the installation/replacement of three generators. The generators will be fixed assets. This project involves the addition of a second generator at Prince County Hospital (750KW) and the replacement of outdated generators at Beach Grove Home (350KW) and Hillsborough Hospital (50KW). New generators at these facilities will be sized to provide a minimum of 48 hours of backup power. Meeting CSA hospital electrical standards will minimizes risk of power failure to patients, and lessens the risk of hospital evacuation in the event of a prolonged power outage.

Original sector

Community, Culture and Recreation

Location

Country

Canada

State

Prince Edward Island

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Hospital, Power Generation (CCGT), Residential, Government

Article published date

2025-07-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project