Health Sciences Centre (HSC) - HVAC Controls Upgrade Phase 1
Sector: Ventilation Systems • Location: Manitoba, Canada
Source: Infrastructure Canada
The Health Sciences Centre (HSC) - HVAC Controls Upgrade Phase 1 project (the Project) consists of and upgrade of obsolete an HVAC control system, in order to better provide optimal environmental conditions. Existing controls are inaccurate resulting in sub-optimal air quality, including temperature, humidity, the amount of outside air and air changes.
- Status
- Prospective
- Sector
- Ventilation Systems
- Location
- Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Health Sciences Centre (HSC) - HVAC Controls Upgrade Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Health Sciences Centre (HSC) - HVAC Controls Upgrade Phase 1 project (the Project) consists of and upgrade of obsolete an HVAC control system, in order to better provide optimal environmental conditions. Existing controls are inaccurate resulting in sub-optimal air quality, including temperature, humidity, the amount of outside air and air changes. |
Original sector | Ventilation Systems |
Location
Country | Canada |
State | Manitoba |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Article published date | 2026-04-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
