Heap Leach Pad Channel Drainage Sole Source
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The requirement is for reclamation/fluid management activities, design of Heap Leach Pad channel drainage, and design/build of Evaporation cells within the existing mine process ponds, while simultaneously managing the process fluid drain down system at the Denton Rawhide Mine.
- Status
- Prospective
- Sector
- Water Supply and Storage, Raw Materials, Commercial, Waste Processing and Treatment
- Location
- Nevada, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Heap Leach Pad Channel Drainage Sole Source
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The requirement is for reclamation/fluid management activities, design of Heap Leach Pad channel drainage, and design/build of Evaporation cells within the existing mine process ponds, while simultaneously managing the process fluid drain down system at the Denton Rawhide Mine. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Commercial, Waste Processing and Treatment |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
