Heartland State Trail Steamboat Connection
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. SUMMARY OF WORK: 1. Construct 1,610 LF. of bituminous bike trail and Repair 960 LF. of existing bituminous bike trail. 2. Granular borrow 733 CY. 3. Aggregate base 3,998 S.Y. (8 Thick) 4. Bituminous surfacing 2,856 SY. (2.5 Thick) 5. Grade and compact sub-g
- Status
- Prospective
- Sector
- Car parking, Automotive, Commercial, Raw Materials, Fertilizers
- Location
- Walker, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Heartland State Trail Steamboat Connection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. SUMMARY OF WORK: 1. Construct 1,610 LF. of bituminous bike trail and Repair 960 LF. of existing bituminous bike trail. 2. Granular borrow 733 CY. 3. Aggregate base 3,998 S.Y. (8 Thick) 4. Bituminous surfacing 2,856 SY. (2.5 Thick) 5. Grade and compact sub-grade 3,998 SY. 6. Turf Establishment 5,605 SY. C. DESCRIPTION OF ALTERNATE: Alternate 1: 1. Repai... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Walker |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Automotive, Commercial, Raw Materials, Fertilizers |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
