Heat Recovery Facility at Microsoft Data Center
Sector: Power Transmission • Location: Finland
Source: Bloomberg
The Finnish utility Fortum Oyj is constructing a heat recovery facility on the site of an under-construction Microsoft data center in Kirkkonummi, Finland. This facility will utilize waste heat from the data center to provide heating for local homes, significantly reducing energy costs and environmental impact.
- Status
- Under Construction
- Sector
- Power Transmission, Power Generation (CCGT), Data Center
- Location
- Finland
- Updated
- 22 Jul 2026
- Source
- Bloomberg
ConstructChat
Ask ConstructChat about Heat Recovery Facility at Microsoft Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Finnish utility Fortum Oyj is constructing a heat recovery facility on the site of an under-construction Microsoft data center in Kirkkonummi, Finland. This facility will utilize waste heat from the data center to provide heating for local homes, significantly reducing energy costs and environmental impact. |
Original sector | Energy |
Location
Country | Finland |
Source
Source | Bloomberg |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Data Center |
Article published date | 2025-05-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
