Ferrovial Business Lines Projects Heathrow Post T5 Transfer Baggage Tunnel London, United Kingdom 2008-2012 Dates 2.1 km Baggage tunnel 3000 /h Bags capacity The Heathrow Post T5 Transfer Baggage Tunnel is a network of underground baggage tunnels and a major part of the Heathrow Connectivity Programme. The project included an automated baggage transfer system and buildings, with capacity to mana

Project Information FAQ

Project Information

4 Q
The project “Heathrow Post T5 Transfer Baggage Tunnel” is an infrastructure initiative in the Airport sector. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects Heathrow Post T5 Transfer Baggage Tunnel London, United Kingdom 2008-2012 Dates 2.1 km Baggage tunnel 3000 /h Bags capacity The Heathrow Post T5 Transfer Baggage Tunnel is a network of underground baggage tunnels and a major part of the Heathrow Connectivity Programme. The project included an automated baggage transfer system and buildings, with capacity to manage 3,000 bags per hour between Terminals 5C, 3 and 1. The tunnels operate a Destination Coded Vehicles track system, comprising 960 carts capable of transporting luggage at speeds of up to 32km/h. We constructed a 2.1km tunnel connecting the baggage transfer facility at the new Terminal 5C with the existing Terminals 1 and 3. We were the Complex Building Integrator for the construction and multi-disciplinary fit-out. The scope of works, split across four different contracts, comprised enabling works, design and construction of all the civil works including the new tunnel, three shafts, the Western Interface Building and one new stand, M&E fit-out, installation and commissioning of the Building Controls System and integration of the track system for the Destination Coded Vehicles. The Western Interface Building (WIB), linking the new transfer baggage system to Terminal 3 and the T3 Integrated Baggage System, has a footprint of 6,800m² across three stories. Construction scope included piled foundations, structural steel frame, cladding, roofing, M&E and fit-out. Health and safety was our primary concern, particularly as the tunnels and shafts were constructed around highly sensitive areas of the airport, including the Heathrow fuel farm. This has been one of the great achievements of the project, achieving two million RIDDOR-free hours worked. We consistently achieved the milestone dates ahead of programme while minimising disruption at the airport and maintaining costs within the client’s budget. Added Value Despite being deemed 2009's number one risk to Heathrow’s operations, the tunnel was completed with zero impact on the airport operations and £12m under the original budget. We worked closely with HAL and our supply chain to develop a Scheme Design, developing an innovative fit-out solution that enhanced safety and produced significant cost and time savings. We used Design for Manufacturing and Assembly (DfMA) techniques to help us develop a modular system that enabled elements of the installation to be prefabricated outside the tunnel. 200 modules were assembled offsite and installed in the tunnel, achieving a 25% reduction in programme and associated costs. Two million RIDDOR-free hours - recognised as the safest-ever tunnelling project by the HSE and received public recognition from BAA for excellent Health & Safety PerformanceThe tunnel safely crossed assets including 185 separate services, nine buildings, five taxiways, 11 stands, the Piccadilly and Heathrow Express rail lines, and the main road leading to the airport. Underground 3 shafts at T1, T3 and T5C Three storey 6800 m² WIB at T3 Pavement QA 350 m³ m² in construction

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data