Heating Plant Boiler Phase 4
Sector: Water Supply and Storage • Location: Oshkosh, Wisconsin, United States of America
Source: Dodge USA
: Rebuild No. 4 boiler at the UWO Heating Plant. The work includes repair, parts, diagnosis, and tuning of the boiler. The burner throat needs major repair, the pressure regulator for steam atomization needs to be replaced. The boiler has an unknown low water alarm issue that needs diagnosing and correction.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Manufacturing (Industrial)
- Location
- Oshkosh, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Heating Plant Boiler Phase 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | : Rebuild No. 4 boiler at the UWO Heating Plant. The work includes repair, parts, diagnosis, and tuning of the boiler. The burner throat needs major repair, the pressure regulator for steam atomization needs to be replaced. The boiler has an unknown low water alarm issue that needs diagnosing and correction. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Oshkosh |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
