Hebei Rural Renewable Energy Development Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Project Development Objective (PDO) for the Hebei Rural Renewable Energy Development Project in China is to demonstrate sustainable biogas production and utilization to reduce environmental pollution and supply clean energy in rural areas of Hebei Province. This project is made up of two components. Component 1 is labeled: Large-scale biogas facilities management and renewable energy supply. U
- Status
- Closed
- Sector
- Fertilizers, Power Generation (CCGT), Biomass, Residential, Raw Materials, Government, Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Hebei Rural Renewable Energy Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project Development Objective (PDO) for the Hebei Rural Renewable Energy Development Project in China is to demonstrate sustainable biogas production and utilization to reduce environmental pollution and supply clean energy in rural areas of Hebei Province. This project is made up of two components. Component 1 is labeled: Large-scale biogas facilities management and renewable energy supply. Under this component the national and international best practice in developing large-scale biogas facilities will be introduced and demonstrated. Six biogas facilities will be installed and operated in Hebei, as six investment subprojects, to effectively convert agricultural wastes (specifically crop residues and livestock manure) to biogas and to provide stable clean energy to local rural residents. The subprojects are located in six project counties, namely Anping, Yutian, Zunhua, Linzhang, Chengde, and Laoting counties. Component 2 is labeled: Technical support, project management and monitoring. This component will support technical services, training, monitoring and evaluation, and project management. Specifically, (a) an expert team will be contracted by Provincial Project Management Office (PPMO) to provide technical assistance for project implementation; (b) for each subproject a sample laboratory will be established for stabilizing day-to-day biogas facilities operation by analyzing and controlling fermenting conditions of biogas digesters and testing biogas and slurry; (c) a monitoring system will be established both at subprojects level to monitor their individual biogas system operation and at provincial level to monitor overall project biogas system operation, project performance and its impacts; (d) around 1,800 person-day training will be arranged for project technical and management staff at provincial and county levels, in particular for the local technical staff at the Project Implementation Units (PIUs) to obtain the skills in operating subprojects; and (e) biogas digester operation manual and digestate application manual will be developed to guide biogas program management in Hebei. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Energy and Extractives |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Fertilizers, Power Generation (CCGT), Biomass, Residential, Raw Materials, Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
