logo
ProjectAwarded

Heber 1 Geothermal Facility PPA Extension

Awarded · California · Last reported Aug 2025

Source: Renewable Energy Magazine

Ormat Technologies signed a 25-year extension to its existing power purchase agreement with the Southern California Public Power Authority for 52MW from the Heber 1 geothermal facility. This agreement ensures continued delivery of clean, baseload geothermal energy to Los Angeles Department of Water and Power and the Imperial Irrigation District, supporting California's climate and energy transitio

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Geothermal, Government
Location
Imperial Valley, California, United States of America
Updated
22 Jul 2026
Source
Renewable Energy Magazine

ConstructChat

Ask ConstructChat about Heber 1 Geothermal Facility PPA Extension

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Heber 1 Geothermal Facility PPA Extension” is an infrastructure initiative in the Water Supply and Storage sector, located in Imperial Valley, California, United States. Taiyo aggregates data on it from Renewable Energy Magazine.

Participants

Sponsoring Agency

Company

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ormat Technologies signed a 25-year extension to its existing power purchase agreement with the Southern California Public Power Authority for 52MW from the Heber 1 geothermal facility. This agreement ensures continued delivery of clean, baseload geothermal energy to Los Angeles Department of Water and Power and the Imperial Irrigation District, supporting California's climate and energy transition goals.

Original sector

Energy

Location

Country

United States of America (USA)

State

California

City

Imperial Valley

Source

Source

Renewable Energy Magazine

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Geothermal, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project