Heck Campus Waste Pipe Replacement REBID
Closed · New York · Last reported Sep 2025
Source: Dodge
2025 Waste Pipe Replacement Project for O.D. Heck Campus Building 9. The Contractor will excavate, remove, and replace eroded waste (sewer) pipe in Building 9, located on the Office for People With Developmental Disabilities (OPWDD) O.D. Heck Campus, 500 Balltown Road, Schenectady, NY 12304 for OPWDD Capital District DDSOO. The sewer and storm drainpipe underneath Building 9 needs replacement. The
- Status
- Closed
- Sector
- Waste Processing and Treatment, Road, Water Supply and Storage, Residential, Commercial, Government
- Location
- Schenectady, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Heck Campus Waste Pipe Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 2025 Waste Pipe Replacement Project for O.D. Heck Campus Building 9. The Contractor will excavate, remove, and replace eroded waste (sewer) pipe in Building 9, located on the Office for People With Developmental Disabilities (OPWDD) O.D. Heck Campus, 500 Balltown Road, Schenectady, NY 12304 for OPWDD Capital District DDSOO. The sewer and storm drainpipe underneath Building 9 needs replacement. The Contractor will provide all labor and materials necessary to complete the work in a professional... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Schenectady |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Water Supply and Storage, Residential, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
