Heenan Place Sanitary Sewer Relining - East End
Sector: Waste Processing and Treatment • Location: Ontario, Canada
Source: Infrastructure Canada
Relining of 200 mm diameter concrete sanitary pipe utilizing cured-in place pipe no dig technology. The current concrete pipe installed in the 1960’s is presumed to be exhibiting interior spalling and loss of interior surface based on CCTV of neighbouring pipes that were installed in the same installation period. The adjoining watermain is deemed to be in good condition making this project an exce
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Cement, Residential
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Heenan Place Sanitary Sewer Relining - East End
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Relining of 200 mm diameter concrete sanitary pipe utilizing cured-in place pipe no dig technology. The current concrete pipe installed in the 1960’s is presumed to be exhibiting interior spalling and loss of interior surface based on CCTV of neighbouring pipes that were installed in the same installation period. The adjoining watermain is deemed to be in good condition making this project an excellent choice for rehabilitation. This rehabilitation will avoid open cut trenching that will minimize the disruption to approximately 18 residential homes along the length of pipe being rehabilitated. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Cement, Residential |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
