Helen Dr. Streetlights Install
Sector: Metal • Location: Strathroy, Ontario, Canada
Source: Dodge USA
Streetlight conductor Entegrus supply and contractor install Non-Metallic Wet Underground (NMWU) #6/2 Cu conductor. Details and Quantities: Install 1 duplex conductor per 2 conduit. Conduit already installed. 7.1. #6/2 from TX1-4991 to SL13 location, 111 m length 7.2. #6/2 from SL13 location to SL12 location, 61 m length 7.3. #6/2 from SL12 location to SL11 location, 43 m length 7.4. #6/2 from SL1
- Status
- Prospective
- Sector
- Metal, Road, Commercial
- Location
- Strathroy, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Helen Dr. Streetlights Install
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Streetlight conductor Entegrus supply and contractor install Non-Metallic Wet Underground (NMWU) #6/2 Cu conductor. Details and Quantities: Install 1 duplex conductor per 2 conduit. Conduit already installed. 7.1. #6/2 from TX1-4991 to SL13 location, 111 m length 7.2. #6/2 from SL13 location to SL12 location, 61 m length 7.3. #6/2 from SL12 location to SL11 location, 43 m length 7.4. #6/2 from SL13 location to SL14 location, 60 m length 7.5. #6/2 from SL14 location to SL15 location, 41 m length |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Strathroy |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Road, Commercial |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
