logo
ProjectPre-Design

Helen Haller Elementary School Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Proposal to replace Helen Haller Elementary School, which currently houses about 530 students in grades 3-5 but was originally built for 350 students.

Status
Prospective
Sector
Government, Education, Commercial
Location
Sequim, Washington, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Helen Haller Elementary School Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Helen Haller Elementary School Replacement” is an infrastructure initiative in the Government sector, located in Sequim, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Proposal to replace Helen Haller Elementary School, which currently houses about 530 students in grades 3-5 but was originally built for 350 students.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Sequim

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Education, Commercial

Article published date

2024-12-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project