Helios I Solar Project
One of 7 projects Taiyo tracks in Transylvania.
Source: Legal Desire Media and Insights
The Helios I project is an 85 MW solar power generation complex located in Arad, Transylvania, Romania. The project involves the development, construction, and operation of a solar photovoltaic park on a 68-hectare site, repurposing a former coal-fired power plant ash disposal facility. It is set to become the largest east-west-oriented solar power generation complex in Eastern Europe.
- Status
- Under Construction
- Sector
- Solar, Power Generation (CCGT)
- Location
- Arad, Transylvania, Romania
- Updated
- 22 Jul 2026
- Source
- Legal Desire Media and Insights
ConstructChat
Ask ConstructChat about Helios I Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Helios I project is an 85 MW solar power generation complex located in Arad, Transylvania, Romania. The project involves the development, construction, and operation of a solar photovoltaic park on a 68-hectare site, repurposing a former coal-fired power plant ash disposal facility. It is set to become the largest east-west-oriented solar power generation complex in Eastern Europe. |
Original sector | Energy |
Budget |
Location
Country | Romania |
State | Transylvania |
City | Arad |
Source
Source | Legal Desire Media and Insights |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Romania
- Project Batar
- Stada Arzneimittel Supply Chain and Packaging Facility, Turda, Romania
- Beta Solar PV Park
- Romania UCEA Solar PV Park
- Alpha Solar PV Park
- Transport infrastructure rehabilitation in the Ungheni-Iasi cross-border area which aims at traffic streamline in the Sculeni border crossing point - 3,1,1 valori 3 indicatori neprecizati
- Green economy for greener local communities in Danube area
- Montana – Dolj : Better access-closer communities
