logo

Helios Mokresh Solar Plant

Sector: Solar • Location: Bulgaria

Source: World Bank Group

Project
Active

Helios Power (Bulgaria) developed the 4.16 MW Mokresh solar plant, near Valchedram, Northwestern Bulgaria. The project company was Mokresh Solar Park.

The plant was commissioned in October 2010. The tariff for the project is EUR 357.45/MWh, for a period of 25 years with CEZ. Project life is 25 years. The equipment was provided by Mitsubishi International Corporation, supplying three types of PV

Project Information FAQ

Project Information

4 Q
The project “Helios Mokresh Solar Plant” is an infrastructure initiative in the Solar sector, located in Bulgaria. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Helios Power (Bulgaria) developed the 4.16 MW Mokresh solar plant, near Valchedram, Northwestern Bulgaria. The project company was Mokresh Solar Park. The plant was commissioned in October 2010. The tariff for the project is EUR 357.45/MWh, for a period of 25 years with CEZ. Project life is 25 years. The equipment was provided by Mitsubishi International Corporation, supplying three types of PV modules: Hyundai HIS 203/206/209 SG (1MWp), Hyundai HIS 227/230/233 SG (2MWp), CEEG - CSUN 240 - 60P (1MWp). The inverter was supplied by TMEIC (Toshiba Mitsubishi - Electric Industrial Systems Corporation). The support structure was supplied by Sadef (Belgium), and Corus (UK). Annual maintenance costs are EUR 0.013/kWh. Insurance for the project is provided by ALLIANZ. Corporate tax rate is 10%. Total project cost was unavailable, but the average cost in 2011 was US$3.9 million/MW: US$16.2 million. Financial closure date was estimated at October 2010, date of commissioning. The coordinates of the project are: Lat. 43°45' N, Long. 23°24' E http://www.heliospower.bg/proj_01.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data