logo
ProjectActive

Helios Valchedram Solar Plant

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Helios Power (Bulgaria) developed the 1.82 MW Valchedram solar plant, near Valchedram, Northwestern Bulgaria. The project company was Solar Valchedram EOOD.

The plant was commissioned in August 2011. The tariff for the project is EUR 357.45/MWh, for a period of 20 years. Project life is 25 years. The project utilizes CSUN 230-60P solar panels, manufactured by CEEG Nanjing Renewable Company Ltd.

Status
Prospective
Sector
Manufacturing (Industrial), Power Generation (CCGT), Solar, Power Transmission, Commercial, Government
Location
Bulgaria
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Helios Valchedram Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Helios Valchedram Solar Plant” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Bulgaria. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Helios Power (Bulgaria) developed the 1.82 MW Valchedram solar plant, near Valchedram, Northwestern Bulgaria. The project company was Solar Valchedram EOOD. The plant was commissioned in August 2011. The tariff for the project is EUR 357.45/MWh, for a period of 20 years. Project life is 25 years. The project utilizes CSUN 230-60P solar panels, manufactured by CEEG Nanjing Renewable Company Ltd. (China). The inverter is supplied by SMA Solar Technology AG, string inverters Sunny Tripower 15000TL/17000TL. The Support structure is supplied by ATARO KLIMA, from Bulgaria. Annual maintenance costs are EUR 0.013/kWh. Insurance for the project is provided by ALLIANZ. Corporate tax rate is 10%. Total project cost was unavailable, but the average cost in 2011 was US$3.9 million/MW: US$7.1 million. Financial closure date was estimated at August 2011, date of commissioning. The coordinates of the project are: Lat. 43°27' N, Long. 23°11' E http://www.heliospower.bg/proj_02.html

Original sector

Energy

Budget

Location

Country

Bulgaria

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Power Generation (CCGT), Solar, Power Transmission, Commercial, Government

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project