logo

Helios Valchedram Solar Plant

Sector: Solar • Location: Bulgaria

Source: World Bank Group

Project
Active

Helios Power (Bulgaria) developed the 1.82 MW Valchedram solar plant, near Valchedram, Northwestern Bulgaria. The project company was Solar Valchedram EOOD.

The plant was commissioned in August 2011. The tariff for the project is EUR 357.45/MWh, for a period of 20 years. Project life is 25 years. The project utilizes CSUN 230-60P solar panels, manufactured by CEEG Nanjing Renewable Company Ltd.

Project Information FAQ

Project Information

5 Q
The project “Helios Valchedram Solar Plant” is an infrastructure initiative in the Solar sector, located in Bulgaria. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Helios Power (Bulgaria) developed the 1.82 MW Valchedram solar plant, near Valchedram, Northwestern Bulgaria. The project company was Solar Valchedram EOOD. The plant was commissioned in August 2011. The tariff for the project is EUR 357.45/MWh, for a period of 20 years. Project life is 25 years. The project utilizes CSUN 230-60P solar panels, manufactured by CEEG Nanjing Renewable Company Ltd. (China). The inverter is supplied by SMA Solar Technology AG, string inverters Sunny Tripower 15000TL/17000TL. The Support structure is supplied by ATARO KLIMA, from Bulgaria. Annual maintenance costs are EUR 0.013/kWh. Insurance for the project is provided by ALLIANZ. Corporate tax rate is 10%. Total project cost was unavailable, but the average cost in 2011 was US$3.9 million/MW: US$7.1 million. Financial closure date was estimated at August 2011, date of commissioning. The coordinates of the project are: Lat. 43°27' N, Long. 23°11' E http://www.heliospower.bg/proj_02.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data