logo

Helios Yerusalimovo Solar Plant

Sector: Solar • Location: Bulgaria

Source: World Bank Group

Project
Active

Helios Power (Bulgaria) developed the 5.0 MW Yerusalimovo solar plant.

The plant was commissioned in June 2012. The tariff for the project is EUR 248.3/MWh, for a period of 20 years with EVN, a vertically integrated utility company from Austria (51% state-owned). Project life is 25 years. The equipment was provided by Mitsubishi International Corporation, supplying CSUN 240-60P solar panels, fro

Status
Prospective
Sector
Solar, Car parking, Power Generation (CCGT), Power Transmission, Government, Automotive, Commercial
Location
Bulgaria
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Helios Yerusalimovo Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Helios Yerusalimovo Solar Plant” is an infrastructure initiative in the Solar sector, located in Bulgaria. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Helios Power (Bulgaria) developed the 5.0 MW Yerusalimovo solar plant. The plant was commissioned in June 2012. The tariff for the project is EUR 248.3/MWh, for a period of 20 years with EVN, a vertically integrated utility company from Austria (51% state-owned). Project life is 25 years. The equipment was provided by Mitsubishi International Corporation, supplying CSUN 240-60P solar panels, from CEEG Nanjing Renewable Company Ltd. (CHina). The inverters were supplied by SMA Solar Technology AG, Tripower 17000TL-10 (1080ENDE). Annual maintenance costs are EUR 0.013/kWh. Insurance for the project is provided by ALLIANZ. Corporate tax rate is 10%. Total project cost was unavailable, but the average cost in 2011 was US$3.9 million/MW based on PPI-RE data: US$11.7 million. Financial closure date was estimated at June 2012, date of commissioning. The coordinates of the project are: 41.857881° N Latitude 26.125695° E Longtitude http://www.heliospower.bg/proj_05.html

Original sector

Energy

Budget

Location

Country

Bulgaria

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Car parking, Power Generation (CCGT), Power Transmission, Government, Automotive, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project