logo

Helios Zelena Svetlina Solar Plant

Sector: Solar • Location: Bulgaria

Source: World Bank Group

Project
Active

Helios Power (Bulgaria) developed the 2.0 MW Zelena Svetlina solar plant.

The plant was commissioned in June 2012. The tariff for the project is EUR 248.3/MWh, for a period of 20 years with EVN. Project life is 25 years. The equipment was provided by Mitsubishi International Corporation, supplying CSUN Quasar 260 series - 60P solar panels, from CEEG Nanjing Renewable Company Ltd. (CHina). The in

Project Information FAQ

Project Information

4 Q
The project “Helios Zelena Svetlina Solar Plant” is an infrastructure initiative in the Solar sector, located in Bulgaria. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Helios Power (Bulgaria) developed the 2.0 MW Zelena Svetlina solar plant. The plant was commissioned in June 2012. The tariff for the project is EUR 248.3/MWh, for a period of 20 years with EVN. Project life is 25 years. The equipment was provided by Mitsubishi International Corporation, supplying CSUN Quasar 260 series - 60P solar panels, from CEEG Nanjing Renewable Company Ltd. (CHina). The inverters were supplied by SMA Solar Technology AG, Tripower 17000TL-10 (1080ENDE). The support structure was supplied by Ellon. Annual maintenance costs are EUR 0.013/kWh. Insurance for the project is provided by ALLIANZ. Corporate tax rate is 10%. Total project cost was unavailable, but the average cost in 2011 was US$3.9 million/MW: US$7.8 million. Financial closure date was estimated at June 2012, date of commissioning. The coordinates of the project are: Lat. 42, 62 15 29 N, Long. 26 23 60 19 E Found in EETK brochure: In May 2010, EETEK Solar entered into a sale and purchase agreement (the “Solar I SPA”) with Mr. Penko Minchev Penkov, for the acquisition of 100 per cent. of the shares of a project company, called Zelena Svetlina 2010 EOOD, incorporated in Bulgaria (the “Solar I Project Company”), established for the purpose of development of the Solar I project (for a description of the Solar I project, see “Business – Investment Projects (Pipeline A) – Bulgaria – Solar I”). Ans also" EETEK Solar purchased 100 per cent. of the shares of Zelena Svetlina EOOD, a company developing a solar PV plant in Bulgaria, and obtained control over it as at 2 June 2010." http://www.heliospower.bg/proj_07.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data