logo

Helium Gathering System and Processing Plant in Montana

Sector: Manufacturing (Industrial) • Location: Montana, United States

Source: Engineering News-Record (ENR)

Project
Under Construction

U.S. Energy Corp. is planning to construct a helium gathering system and processing plant at the Kevin Dome in Toole County, Montana. The $52.2-million project includes laying of pipe, clearing, grading, trenching, pipe stringing, welding, coating, backfilling, testing and restoration, construction of building space and equipment foundations, and installation of storage tanks and dehydration, sepa

Project Information FAQ

Project Information

4 Q
The project “Helium Gathering System and Processing Plant in Montana” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Montana, United States. Taiyo aggregates data on it from Engineering News-Record (ENR).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

U.S. Energy Corp. is planning to construct a helium gathering system and processing plant at the Kevin Dome in Toole County, Montana. The $52.2-million project includes laying of pipe, clearing, grading, trenching, pipe stringing, welding, coating, backfilling, testing and restoration, construction of building space and equipment foundations, and installation of storage tanks and dehydration, separation, evaporation, compression, gas processing, pressure regulating and CO₂ capture and sequestration equipment and systems. The plant will produce 12 million cubic feet of helium and 125,000 metric tons of merchant-grade CO₂ per year. Construction of gathering pipelines was expected to begin in April 2026, with the plant operational in 2027.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data