Hellenic Cables to supply and install 132 kV land cables for SP Transmission’s Douglas North project
Sector: Cable car • Location: Greece
Source: Energy Projects & Technology
Hellenic Cables has been awarded a contract by SP Transmission PLC (SPT), one of UK’s largest grid operators, for the supply and installation of 132 kV land cables required for the connection of Douglas West Windfarm to the new SPT 132 kV Douglas North collector substation and Kennoxhead Extension Windfarm to Middlemuir Windfarm substation, via modification of the existing Coalburn – Middlemuir 13
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Hellenic Cables has been awarded a contract by SP Transmission PLC (SPT), one of UK’s largest grid operators, for the supply and installation of 132 kV land cables required for the connection of Douglas West Windfarm to the new SPT 132 kV Douglas North collector substation and Kennoxhead Extension Windfarm to Middlemuir Windfarm substation, via modification of the existing Coalburn – Middlemuir 132kV underground circuit. The existing Coalburn to Middlemuir 132kV underground cable circuit is required to be modified in order to facilitate the connection of 2 new wind farms; Douglas West (51 MW) and Kennoxhead Extension (60 MW). The works will include modifications of the existing circuit as well as uprating of the existing cables and redesigning of the earthing system of both the new Coalburn to Douglas North and Douglas North to Middlemuir circuits to ensure that the bonding is balanced following the diversion required to connect Douglas North 132/33kV substation. Under the contract, Hellenic Cables will supply approx. 10 km of 132 kV XLPE-insulated cables and associated accessories, including installation & final testing services through selected partners in the UK. This contract testifies to Hellenic Cables’ continuous presence and investment in the UK market, where it already operates three stock locations. The cables will be manufactured at Hellenic Cables’ plant in Thiva, Greece, in the fourth quarter of 2020. With its highly skilled and experienced personnel, state-of-the-art facilities and adherence to best working practices, the plant can produce and deliver high-quality power cables serving the biggest utilities in Europe and beyond. Source: https://www.cablel.com/Image source: Courtesy of Hellenic Cables Read more about the Power industry here |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
