Hellenic Cables undertakes electrical interconnection between Zakynthos and Kyllini, Greece
Sector: Hotel • Location: Greece
Source: Energy Projects & Technology
Hellenic Cables, the cables segment of Cenergy Holdings, was commissioned by IPTO to carry out the electrical interconnection between Zakynthos and Kyllini, Greece, with a total length of 23km. The “turnkey” project includes the design, manufacturing and supply of 150kV land and submarine high voltage cables as well as the associated accessories; the civil engineering works for the installation of
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Hellenic Cables, the cables segment of Cenergy Holdings, was commissioned by IPTO to carry out the electrical interconnection between Zakynthos and Kyllini, Greece, with a total length of 23km. The “turnkey” project includes the design, manufacturing and supply of 150kV land and submarine high voltage cables as well as the associated accessories; the civil engineering works for the installation of the land cables; the laying and the protection of the submarine cables; the transitions between the land and submarine cables, jointing and terminations at substations which will be built by IPTO, as well as testing and commissioning. The electrical interconnection of Kyllini-Zakynthos is an important project in the Ionian Islands, aiming to upgrade the Transmission System in western Greece. This particular connection has been in operation since the early 1980s. Due to its age, the Operator initiated its replacement as a priority. The new, upgraded cable connection will be ready to cover the increased loads of the island as early as the following summer season. The implementation of the project, including the installation of the cables, is expected to be completed within ten months from the signing of the relevant contract. The cables will be manufactured at Hellenic Cables’ state-of-the-art plant of submarine cables in Corinth and the plant of land cables in Thiva. Mr. Alexis Alexiou, CEO of Cenergy Holdings and Hellenic Cables, stated: “We work together with IPTO for its vision to achieve electrical sufficiency of our islands, which will support significantly the Greek tourism and provide quality and uninterrupted energy to people living in Greece and visitors around the world.” Source: https://www.cablel.com/Image source: Courtesy of Hellenic Cables Read more Subsea cable news here |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
