HELSTF Water Main Valves Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
construction contract that consists of HELSTF Water Main Valves Replacement at White Sands Missile Range (WSMR), New Mexico. The contractor shall remove and replace seven (7) existing gate valves and install one (1) new gate valve on the HELSTF main potable water distribution system
- Status
- Closed
- Sector
- Aerospace & Defense, Water Supply and Storage, Commercial, Waste Processing and Treatment
- Location
- Fort Bliss, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about HELSTF Water Main Valves Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | construction contract that consists of HELSTF Water Main Valves Replacement at White Sands Missile Range (WSMR), New Mexico. The contractor shall remove and replace seven (7) existing gate valves and install one (1) new gate valve on the HELSTF main potable water distribution system |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Fort Bliss |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Water Supply and Storage, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Aerospace & Defense projects in United States of America
- SAT Terminal B
- Southwest Airlines BWI New Tech Ops Hangar East
- SFO United Airlines Terminal 3 Ticket Counter Redesign and Break Room Refresh
- TPA Parking Garage & Administration Building
- MDW Terminal & Concourse
- Seattle-Tacoma International Airport (SEA) International Arrivals Facility
- LAX Tom Bradley International Terminal Renovation, Apron, & Concourse Demolition
- SJC North Concourse
