Hemkund Ropeway PPP project
Project in tender · India
Source: InfraPPPWorld
The project involves the development of a aerial passenger ropeway between Ghangaria and Hemkund Sahib. The total length of the proposed system would be about 1830 meters. The system involves development of about 12 ropeway towers along the alignment.The preferred bidder will be responsible for the design, build, finance, operation maintenance and transfer of the new facilities. The concession per
- Status
- Under Construction
- Sector
- Cable car, Automotive
- Location
- India
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Hemkund Ropeway PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in tender |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of a aerial passenger ropeway between Ghangaria and Hemkund Sahib. The total length of the proposed system would be about 1830 meters. The system involves development of about 12 ropeway towers along the alignment.The preferred bidder will be responsible for the design, build, finance, operation maintenance and transfer of the new facilities. The concession period will be 30 years including construction period. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Cable car, Automotive |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
