Hemkund Ropeway Project

The status, timeline and source of this project. A free account opens every field.

Source: Times of India

The Hemkund Ropeway Project is a 12.4-km-long ropeway being constructed from Gurudwara Shri Gobindghat to Shri Hemkund Sahib in Uttarakhand. This project aims to reduce travel time for pilgrims, especially those who are unable to walk or ride horses due to age or physical limitations.

Status
Prospective
Location
Amritsar, Uttarakhand, India
Updated
22 Jul 2026
Source
Times of India

ConstructChat

Ask ConstructChat about Hemkund Ropeway Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hemkund Ropeway Project” is an infrastructure initiative, located in Amritsar, Uttarakhand, India. Taiyo aggregates data on it from Times of India.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Hemkund Ropeway Project is a 12.4-km-long ropeway being constructed from Gurudwara Shri Gobindghat to Shri Hemkund Sahib in Uttarakhand. This project aims to reduce travel time for pilgrims, especially those who are unable to walk or ride horses due to age or physical limitations.

Budget

Location

Country

India

State

Uttarakhand

City

Amritsar

Source

Source

Times of India

URL

More Details

Record type

Project

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project