Hemphill Creek New 12/24/27-Inch Wastewater Mains
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge USA
This project consists of constructing a new 12-inch, 24-inch, 27-inch wastewater mains from State Highway 21 & Harris Hill Rd. along Hemphill Creek to the proposed Highway 80 Lift Station (WWMP #11). This project also consists of tying in the existing 8- inch force main from the Gary Job Corp Lift Station and 6-inch force main from the Blanco River Village Lift Station into the proposed 24-inch wa
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial
- Location
- San Marcos, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hemphill Creek New 12/24/27-Inch Wastewater Mains
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of constructing a new 12-inch, 24-inch, 27-inch wastewater mains from State Highway 21 & Harris Hill Rd. along Hemphill Creek to the proposed Highway 80 Lift Station (WWMP #11). This project also consists of tying in the existing 8- inch force main from the Gary Job Corp Lift Station and 6-inch force main from the Blanco River Village Lift Station into the proposed 24-inch wastewater main near the intersection of State Highway 21 and Old Bastrop Highway. WWMP#12 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | San Marcos |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
