Hemphill Reservoir #1 Embankment #1
Sector: Water Supply and Storage • Location: Georgia, United States of America (USA)
Source: Atlanta Watershed
The water system includes two raw water reservoirs located in northwest Atlanta with a combined storage capacity of approximately 525 million gallons, providing about five days of storage for water treatment and distribution. The reservoir east of Howell Mill Road, Hemphill Reservoir #1, provides approximately one-third of the reservoirs’ total storage capacity but is currently not in service. In
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Manufacturing (Industrial), Waste Processing and Treatment, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Atlanta Watershed
ConstructChat
Ask ConstructChat about Hemphill Reservoir 1 Embankment 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active / close out |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The water system includes two raw water reservoirs located in northwest Atlanta with a combined storage capacity of approximately 525 million gallons, providing about five days of storage for water treatment and distribution. The reservoir east of Howell Mill Road, Hemphill Reservoir #1, provides approximately one-third of the reservoirs’ total storage capacity but is currently not in service. In order to provide enough storage capacity to the constituency and reduce the threat of water deficiency, the goal of this project is to return the Hemphill Reservoir #1 to active service. The scope of this project includes: Constructing a permanent drainage system Repairing minor embankment erosion and revetment repairs to both reservoirs Implementing corrective action required by the Georgia Department of Natural Resources |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source reliability | High |
Source | Atlanta Watershed |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Manufacturing (Industrial), Waste Processing and Treatment, Government |
Article published date | 2023-11-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America (USA)
- A Bridge Home Projects
- Southeast Atlanta Green Infrastructure Initiative (SAGII) – Permeable Pavers
- Distribution System Telemetry Improvements
- Southeast Atlanta Green Infrastructure Initiative (SAGII) – Capacity Relief Ponds
- Peachtree Creek – South Fork Green Infrastructure – Cheshire Bridge Road
- Intrenchment Creek Viaduct Rehabilitation
- Municipal Option Sales Tax (MOST) Miscellaneous Stormwater & Drainage Improvements – Phases 1, 2 and 3
- Green Infrastructure Design Challenge - Martin Luther King, Jr. Drive and Hunter Place
