logo

Hemphill/Chattahoochee WTP – Instrumentation & Controls System

Sector: Tunnel • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Project
Inactive / Design

The implementation of the Water Supply Program is the most substantial water system investment since development of the Chattahoochee Water Treatment Plant (WTP). This program will address acute weaknesses in the raw water supply infrastructure identified in recent facility assessments. This project is as crucial to the Water Supply Program as it is to the future efficient operation of Chattahooch

Project Information FAQ

Project Information

5 Q
The project “Hemphill/Chattahoochee WTP – Instrumentation & Controls System” is an infrastructure initiative in the Tunnel sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

inactive / design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The implementation of the Water Supply Program is the most substantial water system investment since development of the Chattahoochee Water Treatment Plant (WTP). This program will address acute weaknesses in the raw water supply infrastructure identified in recent facility assessments. This project is as crucial to the Water Supply Program as it is to the future efficient operation of Chattahoochee and Hemphill WTPs. The existing instrumentation and control systems at these facilities are old and obsolete. The new instrumentation and control system will be used to automate the operation of both plants and the tunnel system from the Chattahoochee River to the Quarry. The scope of this project includes: Replacing three (3) programmable logic controllers at Chattahoochee WTP Replacing three (3) variable frequency drives of the distribution pumps at Hemphill WTP Replacing one (1) programmable logic controller at Hemphill WTP Also included in the scope of this project is the tying of the Division 1 and Division 2 areas of Hemphill WTP into the plant’s supervisory control and data acquisition (SCADA) system.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data