Henan Peak Pacific Power
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
Peak Pacific Investments Pvt Ltd (Singapore), of which Alliant Energy International held a 93.5% stake, acquired 70% stake in a 100 MW coal-fired power plant in China in October 1999. The cost of this transaction was US$28 million. The power plant in Henan China had a 20 year contract to provide power to the Gongyi Power Bureau in Henan China and a neighboring aluminum plant. None None
- Status
- Prospective
- Sector
- Metal, Power Generation (CCGT), Steel, Government
- Location
- Henan, China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Henan Peak Pacific Power
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Peak Pacific Investments Pvt Ltd (Singapore), of which Alliant Energy International held a 93.5% stake, acquired 70% stake in a 100 MW coal-fired power plant in China in October 1999. The cost of this transaction was US$28 million. The power plant in Henan China had a 20 year contract to provide power to the Gongyi Power Bureau in Henan China and a neighboring aluminum plant. None None |
Original sector | Energy |
Budget |
Location
Country | China |
State | Henan |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Metal, Power Generation (CCGT), Steel, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
