Hennessey Grove Utility and Street Improvements
One of 10,000+ projects Taiyo tracks in Minnesota.
Source: Dodge
805 LF 8" PVC Sanitary Sewer Pipe 550 LF 4" PVC Sanitary Service Pipe 950 LF 8" PVC Water Main Pipe 600 LF 1.25" HDPE Water Service Pipe 1,330 LF 15" - 18" RCP Storm Sewer Pipe 1,050 LF 4" - 6" PVC Drain Tile 1,370 CY Select Granular Borrow 4,100 SY Geotextile Fabric, Type 5 Non Woven 690 CY Aggregate Base, Class 5 2,050 LF Concrete Curb and Gutter 3,500 SY Bituminous Mixture for Streets, 1.5" and
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Road, Power Transmission, Power Generation (CCGT), Car parking, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Automotive
- Location
- Maple Grove, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hennessey Grove Utility and Street Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 805 LF 8" PVC Sanitary Sewer Pipe 550 LF 4" PVC Sanitary Service Pipe 950 LF 8" PVC Water Main Pipe 600 LF 1.25" HDPE Water Service Pipe 1,330 LF 15" - 18" RCP Storm Sewer Pipe 1,050 LF 4" - 6" PVC Drain Tile 1,370 CY Select Granular Borrow 4,100 SY Geotextile Fabric, Type 5 Non Woven 690 CY Aggregate Base, Class 5 2,050 LF Concrete Curb and Gutter 3,500 SY Bituminous Mixture for Streets, 1.5" and 2" thick 1,850 LF Bituminous Wedge for Plow Protection 1,450 SY 5" Thick Concrete Sidewalk 2 AC ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Maple Grove |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Road, Power Transmission, Power Generation (CCGT), Car parking, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Automotive |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
