Henry Horton Greenway Trail
Sector: Water Supply and Storage • Location: Chapel Hill, Tennessee, United States of America
Source: Dodge USA
Scope 1. Contractor shall install a flexible porous pavement trail on top of the path prepped by park staff for paving. a. Trail must be a minimum of 1.5 miles (7920 feet) long. b. Trail shall be 60 inches wide. c. Trail must be a minimum of 1.5 inches thick installed over gravel base. d. Trail must have a beveled edge. e. Trail surfacing must be porous to water, with a minimum of 2,250 gallons pe
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Road, Mass Transit, Automotive, Rail, Commercial
- Location
- Chapel Hill, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Henry Horton Greenway Trail
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope 1. Contractor shall install a flexible porous pavement trail on top of the path prepped by park staff for paving. a. Trail must be a minimum of 1.5 miles (7920 feet) long. b. Trail shall be 60 inches wide. c. Trail must be a minimum of 1.5 inches thick installed over gravel base. d. Trail must have a beveled edge. e. Trail surfacing must be porous to water, with a minimum of 2,250 gallons per hour per square foot. f. Trail surfacing must have at least 20% inner void space. g. Trail surf... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Chapel Hill |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Mass Transit, Automotive, Rail, Commercial |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
