Heppner Wind 190MW
Planning schematics · Ohio · Last reported Aug 2025
Source: Dodge
A proposed wind power generation facility that would consist of up to 67 wind turbines with a maximum blade-tip height of 640 feet and a combined generating capacity of up to 190 megawatts, 11 miles of overhead 230-kv transmission line, and other related or supporting facilities. The proposed site boundary includes approximately 31,477 acres of private land in Morrow County. The applicant is Heppn
- Status
- Prospective
- Sector
- Wind, Power Generation (CCGT), Commercial
- Location
- Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Heppner Wind 190MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A proposed wind power generation facility that would consist of up to 67 wind turbines with a maximum blade-tip height of 640 feet and a combined generating capacity of up to 190 megawatts, 11 miles of overhead 230-kv transmission line, and other related or supporting facilities. The proposed site boundary includes approximately 31,477 acres of private land in Morrow County. The applicant is Heppner Lena Wind, LLC, a subsidiary of NextEra Energy Resources, LLC. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Commercial |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- 110 North Wacker
- Ruby Run Tentative Subdivision Map, Special Development Permit, Affordable Housing Plan and Abandonment
- Meadows Field Airport Taxiway G Rehabilitation and
- Abandonment Of Excess Right-Of-Way Fronting 7721 Winding Way
- Lynn's School of English ZV Letter
- 4212 Winding Way
- Oglala Sioux Tribe Broadband Project
- Construction of 525 rental housing units in 4 blocks in the Medina de Cuatro Vientos, Madrid (Spain)