logo
ProjectPre-Design

Herb Pharm Processing Facility (Building 4)

Sector: Warehouse • Location: Central Point, Oregon, United States of America

Source: Dodge USA

22,500 square foot facility, with a proposed asphalt driveway to be located north of the building

Status
Prospective
Sector
Warehouse, Commercial, Road, Raw Materials
Location
Central Point, Oregon, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Herb Pharm Processing Facility (Building 4)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Herb Pharm Processing Facility (Building 4)” is an infrastructure initiative in the Warehouse sector, located in Central Point, Oregon, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

22,500 square foot facility, with a proposed asphalt driveway to be located north of the building

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Central Point

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Warehouse, Commercial, Road, Raw Materials

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project