Herman FSR Bridge Removal
Sector: Metal • Location: Terrace, British Columbia, Canada
Source: Dodge USA
The proposed contract requires the removal of a 13 m All Steel Portable bridge, the removal of 12 concrete lock block and delivery of the above materials to the Terrace Ministry of Forests Yard in Terrace, B.C. Additional works consist of the removal and deactivation of three 600 mm metal culverts located within 200 m up road of the bridge. Culverts will also be delivered to Terrace Yard.
- Status
- Prospective
- Sector
- Metal, Bridge, Cement, Road, Steel, Commercial, Manufacturing (Industrial)
- Location
- Terrace, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Herman FSR Bridge Removal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed contract requires the removal of a 13 m All Steel Portable bridge, the removal of 12 concrete lock block and delivery of the above materials to the Terrace Ministry of Forests Yard in Terrace, B.C. Additional works consist of the removal and deactivation of three 600 mm metal culverts located within 200 m up road of the bridge. Culverts will also be delivered to Terrace Yard. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Terrace |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Bridge, Cement, Road, Steel, Commercial, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
