Hess Road Over Access Road
Sector: Steel • Location: Castle Rock, Colorado, United States of America
Source: Dodge USA
The Project includes the following major items and approximate quantities: 554 SY Removal of Asphalt Mat (Planing) 4 CY Removal of Portions of Present Structure 250 LF Reset Guardrail Type 3 101 Tons Hot Mix Asphalt (Grading SX) (75) (PG 64-22) 554 LF Waterproofing (Membrane) 465 SY Concrete Pavement (8 Inch) 72 LF Sawing and Sealing Bridge Joint 36 LF Bridge Expansion Device (0-4 INCH) 6 CY Concr
- Status
- Closed
- Sector
- Steel, Cement, Bridge, Government, Road, Commercial, Metal
- Location
- Castle Rock, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hess Road Over Access Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following major items and approximate quantities: 554 SY Removal of Asphalt Mat (Planing) 4 CY Removal of Portions of Present Structure 250 LF Reset Guardrail Type 3 101 Tons Hot Mix Asphalt (Grading SX) (75) (PG 64-22) 554 LF Waterproofing (Membrane) 465 SY Concrete Pavement (8 Inch) 72 LF Sawing and Sealing Bridge Joint 36 LF Bridge Expansion Device (0-4 INCH) 6 CY Concrete Class DF 410 LB Reinforcing Steel (Epoxy Coated) Construction Surveying Traffic Control (Spec... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Castle Rock |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Cement, Bridge, Government, Road, Commercial, Metal |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
