Hesston Middle School Demolition and Entry Construction
Sector: Power Transmission • Location: Hesston, Kansas, United States of America
Source: Dodge
The scope of the project includes demolition of substantial portions of the middle school facility, while retaining and securing the gymnasium, boiler room, locker rooms, and the adjacent metal structure; retention of necessary utilities; and construction of new entryways.
- Status
- Closed
- Sector
- Power Transmission, Commercial, Power Generation (CCGT), Government, Metal, Education, Manufacturing (Industrial)
- Location
- Hesston, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hesston Middle School Demolition and Entry Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of the project includes demolition of substantial portions of the middle school facility, while retaining and securing the gymnasium, boiler room, locker rooms, and the adjacent metal structure; retention of necessary utilities; and construction of new entryways. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Hesston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Commercial, Power Generation (CCGT), Government, Metal, Education, Manufacturing (Industrial) |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
