Hexa Climate
The status, timeline and source of this project. A free account opens every field.
Source: IFC Project Disclosures
IFC is considering providing financing of up to INR 29 billion (equivalent to approximately US$300 million) in aggregate, to be structured as senior loans to various Special Purpose Vehicles ("SPVs") wholly owned by Hexa Climate Solutions Private Limited ("Hexa India" or “Promoter”), an India-based renewable-energy developer. The first two commitments under this envelope will be provided to Hexa E
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Solar, Wind, Raw Materials, Automotive, Power Transmission, Road
- Location
- India
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about Hexa Climate
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pending |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | IFC is considering providing financing of up to INR 29 billion (equivalent to approximately US$300 million) in aggregate, to be structured as senior loans to various Special Purpose Vehicles ("SPVs") wholly owned by Hexa Climate Solutions Private Limited ("Hexa India" or “Promoter”), an India-based renewable-energy developer. The first two commitments under this envelope will be provided to Hexa Energy KN1 Private Limited (INR 6,950 million) and Hexa Energy BH2 Private Limited (INR 2,900 million) (collectively referred as the “Borrowers”) for the following two Power Purchase Agreements (PPAs): Hexa Energy KN1 Private Limited: A 160 Mega-Watt (MW) Inter-State Transmission System (ISTS) connected utility-scale Firm and Dispatchable Renewable Energy (FDRE) 2 projects with NHPC Limited (NHPC) as the offtaker and Punjab State Power Corporation Limited (PSPCL) as the end procurer (NHPC PPA); andHexa Energy BH2 Private Limited: A 100 MW ISTS-connected utility-scale hybrid project with CESC Limited (CESC) as the offtaker (CESC PPA)The project assets (including renewable energy and Battery Energy Storage System (BESS)) associated with these PPAs are currently held under multiple Hexa India group companies and are expected to be consolidated/novated into the relevant PPA-holding entities before construction and operation. Prior to deploying the balance amount of the financing envelope to any future project, IFC will undertake a separate appraisal of the relevant project against the applicable IFC Performance Standards. Accordingly, IFC will separately disclose an ESRS and, as applicable, ESAP for each future investment.A. NHPC PPA: Hexa Energy KN1 Private Limited is the counterparty under the NHPC PPA. The project assets are proposed to be set up at the following sites: (a) Mandsaur project assets currently held by Hexa Energy MH10 Private Limited; (b) Merta project assets currently held by Hexa Energy BH3 Private Limited. All these SPVs are part of the Hexa India. The NHPC PPA Scheduled Commencement of Supply Date (SCSD) is June 30, 2027. B. CESC Hybrid PPA: Adyant Power Private Limited is the counterparty under the CESC PPA. Hexa India proposes to novate the PPA to Hexa Energy BH2 Private Limited or one of the IFC Borrowers. The CESC project assets are proposed to be developed in Mandsaur (Madhya Pradesh) / Bhuj (Gujarat) in India. The solar facility for CESC PPA is intended to be developed within the wider Mandsaur development held by Hexa Energy MH10 Private Limited. The CESC PPA SCSD is December 16, 2027. IFC proceeds will be used to finance the development and construction of the following greenfield renewable-energy contracting packages in the state of Rajasthan and Madhya Pradesh which comprises 250 MW of solar photovoltaic capacity and 180 MWh of BESS capacity (collectively, the “Project”).a 50 MW solar photovoltaic facility at Mandsaur, Madhya Pradesh, allocated to the NHPC PPA; a 150 MW solar photovoltaic facility and 180 MWh BESS at Merta, Rajasthan, allocated to the NHPC PPA; anda 50 MW solar photovoltaic facility at Mandsaur, Madhya Pradesh, allocated to the CESC PPA.Collectively, the IFC-financed facilities comprise 250 MW of solar generation capacity and 180 MWh of BESS capacity (the “Project”). These facilities form part of larger renewable energy portfolios developed by Hexa India under the NHPC PPA and CESC PPA, which also include non-IFC-financed wind and BESS assets. Mandsaur Facility: The IFC-financed Mandsaur package comprises of two 50 MW solar PV facilities (50 MW solar under NHPC PPA and 50 MW solar CESC PPA) within Hexa India’s broader Mandsaur renewable energy development, which is planned to include approximately 300 MW of solar capacity, 300 MW of wind capacity, and 85 MWh of BESS. The financed facilities will comprise the solar-module arrays, inverters, internal access roads and drainage, and 33-kV collector infrastructure attributable to the respective solar facilities. The solar facilities are expected to connect to Pooling Sub Station (PSS) and evacuation infrastructure shared with the wider Mandsaur development, including an approximately 46.3-km, 220-kV Transmission Line (TL) to the Mandsaur ISTS substation at village Ranayara, Mandsaur District. The TL corridor is expected to traverse across 18 villages.At appraisal, the facilities were at the development and pre-construction stage, with land assembly, engineering, permitting, procurement, and grid-connection activities ongoing. The TL EPC contractor has been appointed. And construction mobilization has not yet commenced.50 MW solar package for NHPC PPA: An approximately 200-acre footprint has been identified in Sagwali and Garora villages, Tehsil Daloda, Mandsaur District, for the 50 MW solar facility allocated to NHPC PPA. The identified land is privately owned, predominantly used for rainfed agriculture and is being secured through long-term leases. The Mandsaur Environmental and Social Impact Assessment (ESIA) covers the identified 50 MW solar footprint and associated infrastructure, including the indicative TL corridor for NHPC PPA.50 MW solar package for CESC PPA: The CESC PPA identifies Village Lasudi, Tehsil Mandsaur, District Mandsaur, Madhya Pradesh, as the Project location and the 220-kV Mandsaur ISTS substation as the delivery point. As the 50 MW solar facility for the CESC PPA is at an early stage of development, its specific cadastral parcels and physical footprint are being finalized, following which the detailed land requirement, ownership and land-use profile, affected villages and leasing or other land-access arrangements will be confirmed. The 50 MW solar footprint for CESC PPA is not yet defined and has not been assessed at a site-specific cadastral level. The applicable ESIA/ESMP will be prepared in accordance with ESAP #1 once the site and footprint have been finalized.Merta facilities: The IFC-financed Merta facilities consist of a 150 MW solar PV facility and a 180 MWh BESS, forming part of a broader renewable energy development planned to include up to 600 MW of solar capacity and shared evacuation infrastructure. The Merta facilities are expected to include solar-module arrays, inverters, internal access roads and drainage, a 33-kV internal transmission line, BESS, PSS and an approximately 26.8-km, 220-kV TL connecting the PSS to the Igyasani Grid Sub Station (GSS). At the time of appraisal, the final solar and BESS layouts, transmission-line alignment, tower locations and arrangements for ownership and operation of the evacuation infrastructure remained under development. The current land plan for the Project package identifies up to 750 acres across Nokha Phase-02, Asawari, Bhatiyon ki Dhani/Dinghawas and Rool Chandawata in Merta Tehsil, Nagaur District. |
Original sector | V-BF - Solar - Renewable Energy Generation |
Location
Country | India |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Solar, Wind, Raw Materials, Automotive, Power Transmission, Road |
Article published date | 2026-11-07 |
Research
Free account
View all details