HHGC Course Drainage Improvements
Pre-design · Texas · Last reported Sep 2024
Source: Dodge USA
Upon completion of the Drainage Study, certain course drainage upgrades will be recommended by the design firm. These upgrades will include likely include reconfiguring fairways, adding surface and below-ground drainage, rebuilding tee boxes, and resurfacing greens. While the study is not complete, a recent drainage plan for a course in West Houston projects that the drainage recommendations are l
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Government, Commercial, Raw Materials
- Location
- Beaumont, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about HHGC Course Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Upon completion of the Drainage Study, certain course drainage upgrades will be recommended by the design firm. These upgrades will include likely include reconfiguring fairways, adding surface and below-ground drainage, rebuilding tee boxes, and resurfacing greens. While the study is not complete, a recent drainage plan for a course in West Houston projects that the drainage recommendations are likely to be approximately $3M. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Beaumont |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Government, Commercial, Raw Materials |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
