Hickman Road Interchange Project
The owner, status and timeline of this project. A free account opens every field.
Source: The Des Moines Register
Iowa DOT is replacing the interchange at Interstates 80/35 and Hickman Road to improve traffic flow. The new interchange will be a diverging diamond. All ramps are open and will remain so through the end of 2026. Traffic configuration will change in September 2026. Hickman Road will be closed in spring 2027 for bridge construction with detours in place.
- Status
- Under Construction
- Sector
- Transportation
- Location
- Des Moines, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- The Des Moines Register
ConstructChat
Ask ConstructChat about Hickman Road Interchange Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Iowa DOT is replacing the interchange at Interstates 80/35 and Hickman Road to improve traffic flow. The new interchange will be a diverging diamond. All ramps are open and will remain so through the end of 2026. Traffic configuration will change in September 2026. Hickman Road will be closed in spring 2027 for bridge construction with detours in place. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Iowa |
City | Des Moines |
Source
Source | The Des Moines Register |
URL |
More Details
Record type | Project |
Article published date | 2026-07-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
